The conversion result: a curbless walk-in with solid-surface walls, a glass panel, and a handheld beside the rain head.

Tub-to-Shower Conversion · St. George, Utah

Stop stepping over the tub wall

Tub-to-shower conversion in St. George, Utah, for bathrooms that need a walk-in shower.

Licensed and insuredWe guarantee our workWritten estimate before work starts
§01

Intro

St. George Bath & Kitchen does tub-to-shower conversions in St. George, Utah, as part of its bathroom remodeling, and the tub that gets converted most is the one nobody uses. In Washington, it is the garden tub in the master bath, never used, with a small shower everybody does use. In SunRiver, it is the tub in a bathroom that is becoming an age-in-place bathroom, built for a household that now wants to stay in the house and stop stepping over a tub wall. That work takes the tub out, regrades the floor to a linear drain, and puts in a walk-in shower with a bench and grab bars where the household needs them, and where the floor allows, that shower is a curbless shower with nothing to step over at all. This page prices that conversion and tells you when it is the right scope.

Conversion fit checker

Five questions decide whether a tub becomes a shower.

Nothing ticked yet

§02

The tub that gets converted

Not every tub should come out. The tub that gets converted is the one nobody uses, the garden tub in the master bath that has become a shelf for bottles, or the tub in a bathroom built for a household that now wants to stay in the house and stop stepping over a tub wall. The tub that stays is the hall tub in the only bathroom with a tub in it, where the household has children who bathe in it. Washington masters often trade the garden tub for a walk-in shower and keep the hall tub for the kids.

The question is not whether the tub looks old. It is who uses it, and what the morning asks of the room. That is what the visit is for.

The old bath coming apart. Demolition is a stage of the conversion, priced and planned like every other.

The old bath coming apart. Demolition is a stage of the conversion, priced and planned like every other.

The bath out to framing and insulation. The alcove a tub leaves is the footprint the shower inherits.

The bath out to framing and insulation. The alcove a tub leaves is the footprint the shower inherits.

The written estimate is the number that governs

Ranges plan the job. The written estimate prices your room, itemized, before anything is ordered or demolished.

Call 435-412-4316
§03

The floor first

A curbless shower is a floor first and a shower second. The tub comes out first, and the floor underneath it is read before anything is built on it. The floor is regraded to a linear drain, because a walk-in shower is a floor first and a shower second, and the drain is what makes the floor work. The waterproofing is rebuilt as a system behind the tile. The shower goes in with a bench built into it and grab bars with blocking behind the tile, placed where a hand actually reaches. The vanity and the fixtures stay where they are, unless the conversion is part of a full bathroom rebuild.

That is the conversion, and it is priced as its own scope in the written estimate, inside the full bathroom rebuild range of $18,000 to $32,000 or the universal design range of $32,000 to $48,000, depending on whether the bench, the bars, and the door are planned with it.

The floor broken out. A conversion reads the floor first: what is under the tub decides what the shower costs.

The floor broken out. A conversion reads the floor first: what is under the tub decides what the shower costs.

Bath framing and the plumbing rough: the alcove rebuilt to carry a shower instead of a tub.

Bath framing and the plumbing rough: the alcove rebuilt to carry a shower instead of a tub.

Bench framing levelled before its substrate. A bench is structure first; it is framed to be sat on for decades.

Bench framing levelled before its substrate. A bench is structure first; it is framed to be sat on for decades.

Shower tile being set with spacers. The setting is slow because the slope and the lines are the same job.

Shower tile being set with spacers. The setting is slow because the slope and the lines are the same job.

§04

What the visit checks

The conversion is priced from the floor out, so the visit reads the floor first. What is under the tub, whether the drain can move to where a linear drain has to sit, and whether the floor can be regraded without fighting the structure decide what the conversion involves. The vanity and the fixtures are read next: they stay in most conversions, and when they are part of the problem the scope widens into a rebuild and is priced as one. You get the conversion priced as its own scope in the written estimate, with the floor work named as its own line.

§05

The SunRiver conversion, before and after

The SunRiver conversion, told in full on the age-in-place page, is the clearest case of this. The pair below is that bathroom, before and after. The before frame shows a tub shower with a wall to climb over. The after frame shows a curbless shower with a bench and grab bars, the floor regraded to the drain. Look at the floor first, then the shower. That is the order the work was done in, and it is the order that makes a curbless shower work.

The curbless shower from its entry: the pebble floor runs flat to a linear drain with no curb or threshold to step over, a fixed glass panel, a floating bench, two pebble niches, a rain head and a handheld, and grab bars at the controls and along the bench wall.
The same room before: a standard alcove tub with a high step-over wall at the far end, a chrome curtain rod with a plain curtain drawn to one side, and square tile on the walls and floor.
BeforeAfter
BeforeThe same room before: a standard alcove tub with a high step-over wall at the far end, a chrome curtain rod with a plain curtain drawn to one side, and square tile on the walls and floor.
AfterThe curbless shower from its entry: the pebble floor runs flat to a linear drain with no curb or threshold to step over, a fixed glass panel, a floating bench, two pebble niches, a rain head and a handheld, and grab bars at the controls and along the bench wall.
A glass shower over a marble floor: the floor material carries from the room into the shower in a conversion done as one scope.

A glass shower over a marble floor: the floor material carries from the room into the shower in a conversion done as one scope.

The finished shower: bench, grab bar, and handheld in frame. A conversion is finished when it is safe, not when it is tiled.

The finished shower: bench, grab bar, and handheld in frame. A conversion is finished when it is safe, not when it is tiled.

The finished shower from a high angle: bench, hex floor, and the controls wall. The tub’s alcove, answered.
The finished shower from a high angle: bench, hex floor, and the controls wall. The tub’s alcove, answered.
§06

Questions

The alcove stripped to studs, the plumbing roughed. This is what a conversion involves, shown at the stage where the decisions are still cheap.
The alcove stripped to studs, the plumbing roughed. This is what a conversion involves, shown at the stage where the decisions are still cheap.

It is priced in the written estimate as its own scope, inside a full bathroom rebuild at $18,000 to $32,000 or a universal design bathroom at $32,000 to $48,000.

The tub comes out, the floor is regraded to a linear drain, and a walk-in shower goes in with a bench and grab bars where the household needs them.

Most households convert the master garden tub and keep the hall tub for the children.

A shower you walk into, with no tub wall and no curb to step over, the floor regraded to a linear drain.

A bench is part of a walk-in or universal design shower, built in and tiled like the shower.

Yes, with blocking behind the tile before the tile goes on.

A tub-to-shower conversion takes that bathroom out of use. We plan the sequence around a second bathroom, and your written estimate states it.

Yes. St. George Bath & Kitchen is licensed and insured, and the work is guaranteed.

Yes. We guarantee our work, and the final walkthrough does not close until the punch list does.

Call 435-412-4316 or send the form. Tanner Beck, our Operations Manager, sets the visit and measures the room.

Which tub you want converted, who uses it, and whether the hall tub needs to stay for the children.

Then the conversion is usually the wrong scope. The hall tub stays for the children, and the master garden tub is the one that goes.

Priced in writing, before work starts

Send the form or call the shop. Tanner comes out, measures the room, and prices your actual scope in writing.

Start with the form