A finished St. George kitchen: white cabinets, a working island, and light that lasts all day.A primary bath finished the way this shop finishes one: a freestanding tub and marble underfoot.Dark island, pale stone. Counters are chosen for traffic, not for show.A skylight kitchen with a wood island, the kind of room a full-gut scope buys.

St. George Bath & Kitchen

Kitchens and bathrooms rebuilt for the way St. George lives now

Kitchen and bathroom work in St. George, Utah, priced in writing before work starts.

Licensed and insuredWe guarantee our workWritten estimate before work startsSt. George, Utah
§01

Intro

The same two brothers who price a kitchen remodel in St. George, Utah are the ones who answer for it. Fabian Alvarez runs St. George Bath & Kitchen with his brother, through V & F Painting and Construction, a family-run company in Washington County, doing bathroom remodeling, cabinet refacing, tub-to-shower conversions, walk-in showers, and age-in-place bathrooms in St. George, Washington, Hurricane, Santa Clara, and Ivins, for the 1970s, 1980s, and 1990s houses where the cabinets are builder grade and worn at the sink and the stove, and the hall bath still has a fiberglass tub shower.

A kitchen or bathroom job in St. George is not one job. It is a set of scopes, and the scope is what prices the job. A refresh keeps the layout and the boxes that are sound and changes the surfaces, the counters, and the fixtures. A midrange job replaces the cabinets and the counters and rethinks the layout where the house allows it. A full-gut job takes the room back to the studs, moves plumbing where it needs to move, and rebuilds the waterproofing as a system. The pages below each take one scope and price it in our own ranges, and the cost guides on this site price them side by side so you can compare them before you call.

Kitchen and bathroom cost estimator

Pick a room and a scope. The estimator runs on this site’s own published ranges, and nothing else.

The ranges are for planning. Your written estimate prices your actual room, and it is the number that governs.

§02

What it costs, on this page

A kitchen refresh in St. George runs $12,000 to $28,000. A midrange kitchen runs $30,000 to $65,000. A full-gut kitchen runs $55,000 to $95,000. A bathroom refresh runs $8,000 to $15,000. A full bathroom rebuild runs $18,000 to $32,000. A universal design bathroom, built for aging in place, runs $32,000 to $48,000. A bathroom addition runs $50,000 to $70,000. Those are our typical ranges, and your written estimate prices your actual room. The ranges are for planning. The written estimate is the number that governs, and you get it before anything is ordered or demolished.

The ranges separate on what changes. A refresh changes the surfaces and keeps the room. A midrange job changes the cabinets and the counters, and rethinks the layout where the house allows it. A full-gut job changes the room itself, back to the studs. The bathroom ranges separate the same way, on the waterproofing: a refresh trusts it, a full rebuild replaces it as a system, and a universal design bathroom plans the floor, the drain, and the door together from the start.

The written estimate is the number that governs

Ranges plan the job. The written estimate prices your room, itemized, before anything is ordered or demolished.

Call 435-412-4316
§03

The rooms we rebuild, and what each one needs

In a kitchen, the first question is layout. In the 1990s and 2000s subdivisions of Washington, in the older streets of Santa Clara, in the new subdivisions toward Sand Hollow in Hurricane, and in the desert contemporary homes out toward Kayenta in Ivins, it comes back in different words. Does the layout work, or is the layout the problem? If the layout works, a refresh or a midrange job is enough. If the layout is the problem, only a full-gut job fixes it, and the price follows the plumbing and the structure, not the finishes.

A shower that leaks is not a tile problem. It is a waterproofing problem, and waterproofing is a system, not a coat of grout sealer. Water is the first question in any bathroom, because everything else in the room depends on keeping it where it belongs. A tub shower that serves three children daily is the hardest worked fixture in the house, and when its surround starts failing no refresh honestly fixes it. A bathroom built for aging in place starts with the floor, because a curbless shower, a bench, grab bars, and a comfort height toilet only work together when the floor, the drain, and the door are planned as one scope.

Which question comes first depends on the house. In the 1970s and 1980s houses it is water and worn boxes. In the 1990s and 2000s subdivisions, most of Washington and the newer side of Hurricane, it is finishes chosen to a price and layouts drawn for a different household. What can be kept is the starting point in the older homes in Santa Clara. In SunRiver it is how the house lets its owners stay. A first visit reads the house before it prices the room, because the same scope is a different job in each of them.

Kitchen remodeling: the layout question comes first, the finishes second.

Kitchen

Kitchen remodeling: the layout question comes first, the finishes second.

Bathroom remodeling: water first, tile second, on every job.

Bathroom

Bathroom remodeling: water first, tile second, on every job.

Shower remodeling: the membrane is the job; the tile is what shows.

Shower

Shower remodeling: the membrane is the job; the tile is what shows.

Age-in-place work: a bench, bars where the hand lands, a handheld on a slide bar, and a low threshold at the door.

Age-in-place

Age-in-place work: a bench, bars where the hand lands, a handheld on a slide bar, and a low threshold at the door.

Walk-in tubs: the door seals, the seat is built in, and the fill and drain are sized to the house.

Walk-in tub

Walk-in tubs: the door seals, the seat is built in, and the fill and drain are sized to the house.

Cabinet refacing: new doors and drawer fronts on boxes that are sound, finished like a new kitchen.

Refacing

Cabinet refacing: new doors and drawer fronts on boxes that are sound, finished like a new kitchen.

§04

Our projects, in St. George homes

Four scopes, each one a job this business does in this valley.

Featured remodel: a Washington Fields kitchen and hall bath

The same kitchen finished: white shaker uppers over blue lowers, an island where the peninsula stood under two brass pendants, a pro range, and the tall pantry wall rebuilt with the run.
The Washington Fields kitchen as it stood: flat white thermofoil cabinets, a beige laminate peninsula cutting the room in two, a white coil-top range, and a single ceiling light.
BeforeAfter
BeforeThe Washington Fields kitchen as it stood: flat white thermofoil cabinets, a beige laminate peninsula cutting the room in two, a white coil-top range, and a single ceiling light.
AfterThe same kitchen finished: white shaker uppers over blue lowers, an island where the peninsula stood under two brass pendants, a pro range, and the tall pantry wall rebuilt with the run.

Project overview

PlaceWashington Fields, St. George
The houseA 1990s house; three children sharing one hall bath
The jobKitchen and hall bath, done as one combined scope
The estimateOne written estimate for both rooms; the work the rooms share counted once
The rangesKitchen $30,000 to $65,000 · Hall bath $18,000 to $32,000
What the family was looking for, numbered on the plan: 1, an island where the peninsula stood; 2, storage that worked; 3, cabinets not worn through; 4, a shower that doesn't leak, even with three kids in it every day; 5, counters for a family's traffic; 6, light planned for homework and supper.
What the family was looking for, numbered on the plan: 1, an island where the peninsula stood; 2, storage that worked; 3, cabinets not worn through; 4, a shower that doesn't leak, even with three kids in it every day; 5, counters for a family's traffic; 6, light planned for homework and supper.

What the family was looking for

The house is a 1990s Washington Fields home with three kids sharing one hall bath, and the rooms had stopped keeping up. In the kitchen that meant storage that worked and cabinets that were not worn through. In the hall bath it meant a shower that doesn't leak, even with three kids in it every day. The family was staying put, so the work had to be worth doing once and doing right.

The same kitchen from the range end: the peninsula running across the room with the sink at its far end, the tall white pantry wall behind it, and the dining room beyond the opening.
The same kitchen from the range end: the peninsula running across the room with the sink at its far end, the tall white pantry wall behind it, and the dining room beyond the opening.

The problem

The kitchen had nowhere to put anything. The cabinets had worn through where the work happens, at the sink and the stove, and the pantry was a cupboard whose door would not stay shut. Down the hall, the tub and shower surround was starting to fail, and a surround in daily use by three children does not heal with another coat of caulk. Two rooms were short of what the household needed, for different reasons: storage in one, water in the other.

The offered scope underway: the peninsula gone, new boxes clamped at the island position, the room mid-install.
The offered scope underway: the peninsula gone, new boxes clamped at the island position, the room mid-install.

What we offered

Tanner measured both rooms, asked who cooks and who keeps them company at the counter, and offered the two rooms as one combined scope, priced in a single written estimate before any work started. These floor plans stack the two rooms' plumbing, so the demolition and rough-in the rooms share could be counted once instead of twice. Selections for both rooms would be made before demolition, while the rooms were still standing.

A finished white primary bath: the hall bath of the case study, at the end of the combined scope.
A finished white primary bath: the hall bath of the case study, at the end of the combined scope.

The options the family had

They could patch the surround again and leave the kitchen as it stood, the cheapest road and the shortest-lived. They could do one room now and the other later, and pay for the shared plumbing work in both jobs. Or they could do both rooms as one job, with the shared work counted once and one stretch of demolition through the house instead of two. They chose the combined job.

The pricing

As it stood in the written estimate: the kitchen a midrange job, $30,000 to $65,000, with new cabinets and real drawer hardware. An island went where the peninsula had been, counters were chosen for a family's traffic, and light was planned for homework and supper at the same counter. The hall bath a full rebuild, $18,000 to $32,000, the surround rebuilt and the waterproofing done as a system behind the tile. The shared work sat inside the one estimate, counted once.

The two scopes, priced. Tap a room to read its scope and its range.

$30,000 to $65,000

The kitchen, a midrange job

Cabinets replaced with real drawer hardware, an island where the peninsula had been, counters chosen for a family’s traffic, and light planned for homework and supper at the same counter.

Both rooms were priced together in the one written estimate; the demolition and rough-in the rooms share was counted once.

The job closed at a walkthrough that stayed open until the punch list did. The Washington Fields job, told in full on its own page.

River Road kitchen

A kitchen on River Road, in a 1990s ranch house, came to us as a refresh question and left as a full-gut answer. The cabinets were worn at the sink and the stove, the layout wasted the wall where the island should have been, and the plumbing had to move for an island sink. We priced it both ways in writing, refresh and full-gut, and the homeowners chose the full-gut at $55,000 to $95,000, because the layout was the problem and no refresh would have fixed it. The cabinets were replaced, the island went where the peninsula had been, and the counters were chosen for traffic, not for show.

White shaker cabinets and pale quartz counters, a walnut island where the peninsula was with the sink moved into it, a coffered ceiling and a wood floor.
Medium-oak cathedral cabinets and dark speckled granite counters, the peninsula jutting into the room with the sink in it, tile floor, light and clean.
BeforeAfter
BeforeMedium-oak cathedral cabinets and dark speckled granite counters, the peninsula jutting into the room with the sink in it, tile floor, light and clean.
AfterWhite shaker cabinets and pale quartz counters, a walnut island where the peninsula was with the sink moved into it, a coffered ceiling and a wood floor.

Bloomington Hills bathroom

A bathroom in Bloomington Hills, on Brigham Road, was a leaking shower rebuild. The tile looked fine and the waterproofing behind it had failed. We took the shower back to the studs, rebuilt the membrane as a system, and put the tile back on a shower that would stay dry. That is a full rebuild at $18,000 to $32,000, and it is the job that teaches the rule. Water first, tile second.

The same room finished: a white subway-tile surround with a tiled niche, a new tub behind the same striped curtain, and the grey vanity’s quartz top at the left edge.
The hall bath before: a beige square-tile tub surround, the striped curtain, and the vanity counter at the left edge, with a measuring notebook and tape left from the visit.
BeforeAfter
BeforeThe hall bath before: a beige square-tile tub surround, the striped curtain, and the vanity counter at the left edge, with a measuring notebook and tape left from the visit.
AfterThe same room finished: a white subway-tile surround with a tiled niche, a new tub behind the same striped curtain, and the grey vanity’s quartz top at the left edge.

SunRiver bathroom

A bathroom in SunRiver was a tub to curbless shower conversion for a homeowner who wanted to stay in the house. The age-in-place page tells that job in full, and prices the scope at $32,000 to $48,000.

The curbless shower from its entry: the pebble floor runs flat to a linear drain with no curb or threshold to step over, a fixed glass panel, a floating bench, two pebble niches, a rain head and a handheld, and grab bars at the controls and along the bench wall.
The same room before: a standard alcove tub with a high step-over wall at the far end, a chrome curtain rod with a plain curtain drawn to one side, and square tile on the walls and floor.
BeforeAfter
BeforeThe same room before: a standard alcove tub with a high step-over wall at the far end, a chrome curtain rod with a plain curtain drawn to one side, and square tile on the walls and floor.
AfterThe curbless shower from its entry: the pebble floor runs flat to a linear drain with no curb or threshold to step over, a fixed glass panel, a floating bench, two pebble niches, a rain head and a handheld, and grab bars at the controls and along the bench wall.
§05

How the work goes, from first call to walkthrough

You call or send the form. We come out and measure the room, and we listen to what is and is not working. You get a written estimate, itemized, priced in writing before work starts. Selections are made before demolition, so the tile, the counters, and the fixtures are chosen while the room is still standing. The build runs with changes priced in writing before changed work happens. The job closes at a walkthrough, and the walkthrough does not close until the punch list does. That is the practice, and it does not change from a refresh in Bloomington to a full-gut in Santa Clara. We are a local shop. We come to your house. There is no showroom visit to make.

The visit: the room is measured as it stands, before anything is priced.
The visitThe visit: the room is measured as it stands, before anything is priced.
Selections are made before demolition, while the room is still standing.
SelectionsSelections are made before demolition, while the room is still standing.
Mid-build: the boxes go in level and plumb, because every door and counter after them depends on it.
The buildMid-build: the boxes go in level and plumb, because every door and counter after them depends on it.
The same kitchen finished. The walkthrough does not close until the punch list does.
The walkthroughThe same kitchen finished. The walkthrough does not close until the punch list does.
§06

Who you deal with

Tanner Beck is our Operations Manager, and he is the person who measures your room, prices it in writing, runs the work, and answers for it at the final walkthrough. You will meet him on the About page. He is the person you talk to before the job, and the one who keeps the work moving once it starts.

§07

Questions

A refresh runs $12,000 to $28,000, a midrange job $30,000 to $65,000, and a full-gut job $55,000 to $95,000. Most St. George kitchens land midrange, because the layouts work and the finishes do not.

A refresh runs $8,000 to $15,000, a full rebuild $18,000 to $32,000, a universal design bathroom $32,000 to $48,000, and a bathroom addition $50,000 to $70,000.

Yes. We work in St. George, Washington, Hurricane, Santa Clara, Ivins, La Verkin, Leeds, Toquerville, Virgin, Rockville, Springdale, Apple Valley, Dammeron Valley, and Pine Valley. Washington, Hurricane, Santa Clara, and Ivins each have their own page on this site.

A refresh keeps the layout and the sound boxes and changes the surfaces. A full-gut job takes the room back to the studs, moves plumbing where it needs to move, and rebuilds the waterproofing as a system.

Refacing replaces doors and drawer fronts on boxes that are sound. It is a service we offer, and the refacing page prices it in full.

Yes. Itemized, before anything is ordered or demolished.

Tanner Beck, our Operations Manager, from the first measure to the last walkthrough.

Yes. St. George Bath & Kitchen is licensed and insured.

What is and is not working in the room, who uses it and when, and what you cannot find.

Yes. SunRiver is where age-in-place bathrooms are asked for most, and the age-in-place page prices that scope.

Yes. The gallery page shows finished kitchens and bathrooms, and the page that tells each job in full is named under the pair.

Call 435-412-4316 or send the form. Tanner sets the visit, comes out, measures, and prices it in writing.

We use real photography whenever possible. AI-generated images may be used to illustrate concepts, finishes, or design possibilities.

Priced in writing, before work starts

Send the form or call the shop. Tanner comes out, measures the room, and prices your actual scope in writing.

Start with the form