New walls framed on a fresh slab in the desert, the plumbing stubbed up in the floor. An addition is a new room before it is a bathroom.

Bathroom Additions · St. George, Utah

A new bathroom, where the house has none

Bathroom additions in St. George, Utah, built as a new room.

Licensed and insuredWe guarantee our workWritten estimate before work starts
§01

Intro

St. George Bath & Kitchen builds bathroom additions in St. George, Utah: primary suite additions, main-floor bathrooms, and the second bathroom a growing household has run out of. A bathroom addition is a new room, not bathroom remodeling of an old one, and not kitchen remodeling either, because there is no old room to redo. It is the scope for a house where the bathroom count is the problem: a house with one bathroom and a household that has outgrown it, a house whose primary suite has no primary bathroom of its own, or a house where an addition is the only way to get a bathroom on the main floor. This page prices that new room and tells you what it is made of: the walk-in shower, the bathroom vanity, and the tile and flooring that finish it.

Addition scope estimator

One canonical range, and what moves a job inside it.

The ranges are for planning. Your written estimate prices your actual room, and it is the number that governs.

§02

A new room first

A bathroom addition is a new room first and a bathroom second, and the foundation is what makes the bathroom possible. The foundation is poured where the addition will stand. The framing goes up and the roofline is extended to cover it. The plumbing is run to the new room, and the waterproofing is built as a system behind the tile from the start, because a new bathroom has no old waterproofing to work around. The vanity, the shower, and the fixtures are chosen like any bathroom, and the room is finished like any bathroom. The difference is that everything in it is new.

That is why an addition is priced differently from a rebuild. A rebuild works around what is already there. An addition prices the foundation, the framing, the roofline, and the plumbing as their own lines, so you can see what the room costs and what each part costs.

Footings freshly poured beside the existing house, rebar dowels up. The foundation is where an addition’s price starts.

Footings freshly poured beside the existing house, rebar dowels up. The foundation is where an addition’s price starts.

Roof beams on, walls sheathed, the foundation formwork still in the foreground. The roofline tie-in is the addition’s hardest detail.

Roof beams on, walls sheathed, the foundation formwork still in the foreground. The roofline tie-in is the addition’s hardest detail.

The drain plumbing run in the new framing. An added bathroom lives or dies on its drain fall to the existing line.

The drain plumbing run in the new framing. An added bathroom lives or dies on its drain fall to the existing line.

The written estimate is the number that governs

Ranges plan the job. The written estimate prices your room, itemized, before anything is ordered or demolished.

Call 435-412-4316
§03

The scope, priced

A bathroom addition runs $50,000 to $70,000. Your written estimate prices the foundation, the framing, the roofline, and the plumbing as their own lines, so you can see what the room costs and what each part costs. A permit is part of an addition, and we tell you what your plan needs at the estimate.

Those are our typical ranges. Your written estimate prices your actual room, and it is the number that governs.

§04

The Washington Fields addition, before and after

A house in Washington Fields, in a 1990s subdivision, had one hall bath for a family of five and no bathroom on the main floor where the household needed one. The before frame shows the wall where the addition would stand. The after frame shows the added bathroom: a curbless walk-in shower with a bench and grab bars, a wide vanity, and a toilet compartment. The teaching point is in the foundation: without it there is no room, and everything the household uses stands on it.

The added primary bathroom: a wide vanity with a chrome faucet set, a glass curbless shower with a tiled bench and grab bars, and a toilet compartment through the doorway.
The rear of the house before the addition: the back wall and gravel yard where the room would stand, the patio slab with the old interior's material stacked on it, a work table in the foreground.
BeforeAfter
BeforeThe rear of the house before the addition: the back wall and gravel yard where the room would stand, the patio slab with the old interior's material stacked on it, a work table in the foreground.
AfterThe added primary bathroom: a wide vanity with a chrome faucet set, a glass curbless shower with a tiled bench and grab bars, and a toilet compartment through the doorway.
§05

What moves the price

The size of the room moves it. The foundation moves it. Whether the roofline has to be extended or the addition can sit under an existing roofline moves it. Whether the plumbing can be run from the stacked bathrooms above it or has to be run from further away moves it. A permit is part of an addition, and the estimate names what your plan needs before work starts.

Framing and drills in the new room: the walls that will carry the bath’s wet end.

Framing and drills in the new room: the walls that will carry the bath’s wet end.

The room roughed in: framing and plumbing together, the last moment changes are cheap.

The room roughed in: framing and plumbing together, the last moment changes are cheap.

The pan liner and framing in the new room: the shower’s waterproofing starts at the liner, not the tile.

The pan liner and framing in the new room: the shower’s waterproofing starts at the liner, not the tile.

Drywall going up in a new room: the stage where an addition stops being a structure and starts being a room.

Drywall going up in a new room: the stage where an addition stops being a structure and starts being a room.

Waterproofing and tile in the new room: the added bath is built to the same system as a rebuilt one.

Waterproofing and tile in the new room: the added bath is built to the same system as a rebuilt one.

§06

Living alongside it

An addition is built from outside the house in, which is why most households stay in the house while it runs. The foundation, the framing, and the roofline happen on the far side of the existing wall, and the new room is opened into the house near the end, when the room itself is ready to finish. The written estimate states the sequence for your plan, including where the work touches the rooms you are living in, so there are no surprises about which wall opens when.

A just-finished new room, empty and complete. An addition ends as a room the house always should have had.
A just-finished new room, empty and complete. An addition ends as a room the house always should have had.
§07

Questions

An addition’s roof framing tying into the house. The roofline question is answered in the framing, before it can leak.
An addition’s roof framing tying into the house. The roofline question is answered in the framing, before it can leak.

$50,000 to $70,000, priced in the written estimate with the foundation, the framing, the roofline, and the plumbing as their own lines.

A new room, not a remodel of an old one: foundation, framing, roofline, plumbing, and a bathroom finished like any bathroom.

When the bathroom count is the problem: one bathroom for a household that has outgrown it, or no bathroom on the main floor where the household needs one.

The size of the room, the foundation, whether the roofline has to be extended, and whether the plumbing can be run from the stacked bathrooms.

Yes, a bathroom addition needs a permit, and we tell you what your plan needs at the estimate.

Most homeowners do. Your written estimate states the sequence for your house, and the walkthrough does not close until the punch list does.

Yes. St. George Bath & Kitchen is licensed and insured, and the work is guaranteed.

Yes. We guarantee our work, and the final walkthrough does not close until the punch list does.

Call 435-412-4316 or send the form. Tanner Beck, our Operations Manager, sets the visit and measures the room.

Where the addition would stand, what bathroom you need, and whether the plumbing can be run from the stacked bathrooms.

It depends on the room: the foundation, the roofline, and how far the plumbing has to run. Your written estimate states the sequence for your house, stage by stage, before work starts, and the walkthrough does not close until the punch list is empty.

A rebuild works around what is already there. An addition is a new room, priced with the foundation, the framing, the roofline, and the plumbing as their own lines.

Priced in writing, before work starts

Send the form or call the shop. Tanner comes out, measures the room, and prices your actual scope in writing.

Start with the form